May 2008

 

Half complete.

Complete! All twelve tons of it.

 

June 2008

 

New parking lot. We used a vibrating sheeps foot packer on the first layer for six hours.

Recycled concrete with 1 1/2" crusher run on top. Rolled for a smooth surface.

 

July 2008

New concrete slab (1007 sq ft) for outside storage.

New coat of recycled concrete.

8.jpg (763074 bytes)

Helping a home owner with a building project.

9.jpg (871788 bytes)

Packing the fill.

14.jpg (474152 bytes)

Loading the trucks with fill dirt.

Building a pond

Almost there!